Project: Turnkey Project of 66/11 kV- Switchyard (i) 66 kV SWYD at Client End. – (1X7.5 MVA Transformer cum line bays) (ii) 66 kV U/G cable laying – 0.5 km.
Client: Gallops Infra Structure Ltd. (Vestas)
Project: Turnkey Project of 66/11 kV- Switchyard (i) 66 kV SWYD at Client End. – (1X7.5 MVA Transformer cum line bays) (ii) 66 kV U/G cable laying – 0.5 km.
Client: Gallops Infra Structure Ltd. (Vestas)